Saturday 17 May 2008
Bailey Maintenance - Our Experience

Royal Borough of Kensington and Chelsea

Key Features

  • HVAC PPM
  • Emergency Lighting Service and Repair
  • Energy Consultancy
  • Allocated Engineering Resource
  • Mobile Engineering Support
  • 24/7 Helpdesk

Client

Local Authority

Contract Term

April 2001 - Present

Service Area

Approx. 50 Local Council Sites throughout the Borough

The brief

The Royal Borough of Kensington and Chelsea (RBKC) required a Mechanical and Electrical Building Services Planned Preventative Maintenance solution. The contract would cover 32 of their municipal buildings, including, but not limited to, Elderly Persons Care Homes, day care centres and Family Centres.

The council took the decision to outsource this contract in an attempt to find a contractor who could satisfy their diverse needs and requirements. Due to the sensitive nature of some of the sites it was imperative that the contractor could provide a consistent approach and preferably use a dedicated base of engineers to deliver all of the works.


The solution

Bailey Maintenance considered the clients requirements for both planned and reactive work and resolved that the best service solution would be in a mixture of resident and mobile engineers. The contract engineer works solely on the RBKC portfolio and the mobile engineers consist of a dedicated team who are made fully aware of all the requirements and details of this contract. In order to achieve the two-hour response time that is set by the client we have introduced two-wheeled transport to our engineering team. In addition to the original brief we have worked with the RBKC to introduce and develop various energy efficiency plans.



Royal Borough of Kensington and Chelsea

The result

"Bailey Maintenance has shown great flexibility in responding to our needs. They have put in place a contract structure that maximises their ability to provide an excellent all-round service."

Gary McDonnell, Estates Manager,
Royal Borough of Kensington and Chelsea.

Bailey Maintenance's approach to this contract has demonstrated our desire to work in partnership with all of our clients. To date we have provided over and above the initial contract requirements and intend to continue with these innovative and cost saving solutions. In addition since this contract commenced all Bailey Maintenance engineers are subject to CRB Checks upon employment.


Royal Borough of Kensington and Chelsea Logo

 Call us now on 0845 125 5555 or email to see how we can help you.